Yorkshire Almanac 2026

Yorkshire On This Day, Comprising 365 Historical Extracts, Red-letter Days and Customs, and Astronomical and Meteorological Data

17 February 1801: Recent international arrivals and departures at the port of Hull

Hull Packet. 1801/02/17. Hull Ship News. Hull. Get it:

.

Unedited excerpt

If an excerpt is used in the book, it will be shorter, edited and, where applicable, translated.

Foreign ships arrived.
February 6. Industry, Klok; Elizabeth, Simons, both from Rotterdam, with clover feed, geneva [gin], etc. Einigkeit, Reige, from Rostock with wheat, etc. – 14 John, Melvill, from Copenhagen – 15 Vriendschap, Gerts, from Norden.

Foreign ships cleared out.
February 7. Mercur, Wittkopp, for Hamburg – 10. Emilia, Grawitz, for Lubeck. – Anna Christiana, Wullff, for Dantzig, all with woollen drapery, earthenware, ale, etc.

Order the book:
Subscribe to the free daily email:
To facilitate reading, the spelling and punctuation of elderly excerpts have generally been modernised, and distracting excision scars concealed. My selections, translations, and editions are copyright.

Comment

Comment

Something to say? Get in touch

Tags

Tags are assigned inclusively on the basis of an entry’s original text and any comment. You may find this confusing if you only read an entry excerpt.

All tags.

Order the book:
Subscribe to the free daily email:
To facilitate reading, the spelling and punctuation of elderly excerpts have generally been modernised, and distracting excision scars concealed. My selections, translations, and editions are copyright.

Comment

Comment

Something to say? Get in touch

Similar


Order the book:
Subscribe to the free daily email:
To facilitate reading, the spelling and punctuation of elderly excerpts have generally been modernised, and distracting excision scars concealed. My selections, translations, and editions are copyright.

Comment

Comment

Smeaton’s scheme did not prosper. John Timperley:

Various schemes had been suggested for cleansing the dock of the mud brought in by the tide; one was by making reservoirs in the fortifications or old town ditches, with the requisite sluices, by means of which the mud was to be scoured out at low water; another by cutting a canal to the Humber, from the west end of the dock, where sluices had been provided, and put down for the purpose, when it was proposed to divert the ebb tide from the river Hull along the dock, and through the sluices and canal into the Humber, and so produce a current sufficient, with a little manual assistance, to carry away the mud. Both of these schemes were however abandoned, and the plan of a horse dredging machine adopted; this work began about four years after the Old dock was completed, and continued until after the opening of the Junction dock. The machine was contained in a square and flat bottomed vessel 61 feet 6 inches long, 22 feet 6 inches wide, and drawing 4 feet water: it at first had only eleven buckets, calculated to work in 14 feet water, in which state it remained till 1814, when two buckets were added so as to work in 17 feet water, and in 1827 a further addition of four buckets was made, giving seventeen altogether, which enabled it to work in the highest spring tides. The machine was attended by three men, and worked by two horses, which did it at first with ease, but since the addition of the last four buckets, the work has been exceedingly hard.

There were generally six mud boats employed in this dock before the Humber dock was made; since which there have been only four, containing, when fully laden, about 180 tons, and usually filled in about six or seven hours; they are then taken down the old harbour and discharged in the Humber at about a hundred fathoms beyond low water mark, after which they are brought back into the dock, sometimes in three or four hours, but generally more. The mud engine has been usually employed seven or eight months in the year, commencing work in April or May.

The quantity of mud raised prior to the opening of the Junction dock, varied from 12,000 to 29,000 tons, and averaged 19,000 tons per annum; except for a few years before the rebuilding of the Old lock, when, from the bad and leaky state of the gates, a greater supply of water was required for the dock, and the average yearly quantity was about 25,000 tons. As the Junction dock, and in part also the Humber dock, are now supplied from this source, a greater quantity of water flows through the Old dock, and the mud removed has of late been about 23,000 tons a year.

It may be observed, that the greatest quantity of mud is brought into the dock during spring tides, and particularly in dry seasons, when there is not much fresh water in the Hull; in neap tides, and during freshes in the river, very little mud comes in (Timperley 1842).

Something to say? Get in touch

Search

Subscribe/buy

Order the book:
Subscribe to the free daily email:

Donate

Music & books

Place-People-Play: Childcare (and the Kazookestra) on the Headingley/Weetwood borders next to Meanwood Park.

Music from and about Yorkshire by Leeds's Singing Organ-Grinder.

Yorkshire books for sale.

Social

RSS feed

Bluesky

Extwitter